TEL. +44 (0) 1738 627 922

ON SITE SUPPORT

Engineering provides the tools for success, training unlocks
the belief to make them work and onsite support is the glue
which brings both together providing the resilience
to deliver dependable success.
MERLIN ONSITE SUPPORT
ENGINEERING SERVICES

TRAINING SERVICES

ON SITE SUPPORT SERVICES

opacbutton01

Our highly skilled team of ERD Advisors ensure that systems accurately record data, track trends, identify issues and develop safeguards to avoid problems before they occur.  80% of high angle drilling problems are avoidable and existing equipment can drill beyond its perceived limit by applying proven engineering techniques.

Merlin ERD’s unique method of applying aeronautical risk management techniques to advanced drilling applications has yielded gains on “standard” deviated wells through the use of techniques developed for record ERD wells.  In single well projects this presents itself as reduced problem frequency whilst multi-well projects demonstrate well on well improvements.  Both reduce performance uncertainty and increase the confidence to take on more demanding projects.

Let us make your life easier, drill wells longer in distance and shorter in time – unlock your potential and continually improve.

BENEFITS

  • Procedure compliance
  • Improving performance
  • Trend monitoring to avoid problem events
  • Eliminating stuck pipe
  • Very impressive effort congratulations for setting the benchmark so high. Something to aim for
  • “We look forward to continuing to work with each of you and to drilling many more wells together in the future"
  • We would not hesitate to utilise their services again when there is a requirement and recommend them as a well engineering service provider for extended reach drilling projects.
  • Instrumental in delivering our ERD project ahead of schedule
3 well Multi-Lateral In-Fill Drilling Campaign
Implementation of ERD Processes Gives Client Confidence to Drill Record Well
RIGSITE SUPPORT CASE STUDY
•  Narrow mud weight window

•  Mud losses have a negative impact on hydrocarbon production

•  Drag expected to limit ability to run sand screen completion to TD
THE CHALLENGES
Real-time Torque, Drag and Hydraulics modelling, addressed system limiters, enabling real-time decisions on extending lateral lengths
3
OTJ coaching addressed knowledge gaps with rig crew
2
Pre-campaign feasibility study highlighted the requirements to enable successful completion runs
1
MERLIN ADDED SUPPORT

WANT YOUR PROJECT TO BE THE BEST?  CALL +44 1738 627922