Skip to main content
Hit enter to search or ESC to close
Close Search
search
Menu
Servicios
Extended Reach Drilling
Ingeniería
Entrenamiento
Operaciones
Managed Pressure Drilling
Ingeniería
Entrenamiento
Operaciones
Geomechanics
Ingeniería
Entrenamiento
Operaciones
Geotermia
Ingeniería
Entrenamiento
Operaciones
Complex Wells
Ingeniería
Entrenamiento
Operaciones
TDH Software
TDH Software Subscription
TDH Bespoke Development
Course Schedule
Bespoke Training
Tool Kit
Calculadora de Velocidad Anular
Stuck Pipe Mechanism Diagnosis
Referencias
Técnicas
Artículos
Gráfico de envolvente ERD
Videos
Quiz
Soluciones
Casos de Estudio
Retos
Metodología Merlin
News
Empresa
Acerca de Merlin
Nosotros
Propiedad de los Empleados
Empleo
Contacto
Training Login
linkedin
youtube
search
Merlin Quiz - Test Your Knowledge
10 Questions… How many can you answer correctly?
Take The New ERD Quiz!
Paso
1
de
11
9%
Nombre
*
Nombre
Apellidos
Correo electrónico
*
Which factors listed below are relevant for hole cleaning in a high angle well?
Flow rate
String rotation
Sweeps
Drilling fluid rheology
Drilling fluid gel strength
The shakers are close to capacity with large quantities of the material shown in the picture above. What does this indicate?
The mud system is not inhibitive
Downhole shocks and vibrations are high
Hole cleaning appears to be effective
The wellbore is unstable
The mud weight should be increased
While drilling a 12-1/4” hole section the stand pipe pressure limit (maximum pressure that the rig can deliver) is approached. A decision is made to pull out of hole due to an MWD tool failure, but there is still 3,300 ft to drill. For the next run to TD which of the options below would be feasible options for reducing the stand pipe pressure, without adding significant risk for the rest of the section?
Reduce high shear mud rheology
Change mud pumps pop-off settings
Reduce flow rate to 640 gpm
Remove some heavy-weight drill pipe and/or drill collars
Increase bit nozzle size / TFA
An 8-1/2" hole section is drilled in an ERD well (33,000 ft MD; 82° inclination) with 5-1/2” drill pipe and a short, light BHA (~200ft) and oil based mud. What would you expect to contribute the most to surge and swab pressures?
Inclination
Mud weight
Oil / Water ratio
Bottom hole assembly
Drill pipe
Which of the following are benefits of taking pre-connection torque and drag readings with pumps off?
The collected data will be more useful for comparison with tripping data
Actual data will more closely match modelled data
Less risk of swabbing the formation
Avalanching risk reduction
Fewer variable / parameters to control for consistency
The driller is back-reaming out of hole with the torque fluctuating between 30 to 40 kNm with a hookload of approximately 300 MT. Is there cause for concern?
Si
No
Possibly, although more information is required
Downhole tool measurements indicate possible stick-slip vibration while drilling. Select the best course of action.
Reduce WOB, reduce RPM
Leave parameters as they are
Increase WOB, reduce RPM
Reduce WOB, increase RPM
Circulate the hole clean
Which of the following are indicators of borehole instability?
Seepage losses
Fill on bottom after trips
ECD lower than predicted (model)
Divergence of LWD logs from the drilling pass
Cavings on the shakers
On a re-entry (side-track) well that is planned with 10 ppg WBM in the section that has a high casing wear risk, what would be the most effective method of quantifying wear in the donor well casing?
Running a multi-finger mechanical caliper before and after drilling the section
Accurately weighing metal collected from the flow line magnet array while drilling
Simulating wear conditions planned vs historical records
Running an ultra-sonic wireline logging tool before and after drilling the section
None of the above
Floating casing and liner strings is an important enabling technique for ERD wells, however which of the following are considered disadvantages of the technique?
Handling a large quantity of displaced fluid at surface
Inability to circulate when running in hole
Inability to rotate when running in hole
Inability to rotate when cementing
Casing collapse risk
Close Menu
Servicios
Extended Reach Drilling
Ingeniería
Entrenamiento
Operaciones
Managed Pressure Drilling
Ingeniería
Entrenamiento
Operaciones
Geomechanics
Ingeniería
Entrenamiento
Operaciones
Geotermia
Ingeniería
Entrenamiento
Operaciones
Complex Wells
Ingeniería
Entrenamiento
Operaciones
TDH Software
TDH Software Subscription
TDH Bespoke Development
Course Schedule
Bespoke Training
Tool Kit
Calculadora de Velocidad Anular
Stuck Pipe Mechanism Diagnosis
Referencias
Técnicas
Artículos
Gráfico de envolvente ERD
Videos
Quiz
Soluciones
Casos de Estudio
Retos
Metodología Merlin
News
Empresa
Acerca de Merlin
Nosotros
Propiedad de los Empleados
Empleo
Contacto
Training Login
linkedin
youtube
Download your results
"
*
" señala los campos obligatorios
Enter your email to recieve your results with additional advice.
Nombre
*
Nombre
Apellidos
Empresa
*
Correo electrónico
*
Hidden
Flow Rate
Hidden
Flow Rate Unit
Hidden
Hole Size
Hidden
Hole Size Unit
Hidden
Drill Pipe Size
Hidden
Drill Pipe Size Unit
Hidden
AV ft per min
Hidden
AV m per min
X
Download your results now
"
*
" señala los campos obligatorios
Enter your email to recieve your results with additional advice.
Nombre
*
Nombre
Apellidos
Empresa
*
Correo electrónico
*
Hidden
Differential %
Hidden
Wellbore %
Hidden
Packoff %
Hidden
q1
Hidden
q2
Hidden
q3
Hidden
q4
Hidden
q5
Hidden
q6
X
Call Now Button