Skip to main content

Friday Haggler Answer Slideshow

The leak off test shown on the chart below was taken below the 13-3/8” casing shoe. The DSV is ready to make some hole, the geologist has his concerns because the minimum stress is lower than expected. The minimum required leak off is an absolute minimum for well control. Do you side with the DSV and get after it? If not, why not?

Get in touch to discuss your next project

Contact us
Call Now Button