Skip to main content

Velocidad Anular vs
Limpieza de Pozo

Tenga en cuenta: El calculador de AV se basa en el diámetro interno del pozo y el tubo.
Solo el diámetro externo (OD) y no tiene en cuenta el diámetro externo de la conexión.

¿Qué es la Velocidad Anular y por qué es importante?

Annular Velocity Calculator (AV) La Fórmula de Velocidad Anular (VA) es uno de los tres elementos clave para una limpieza efectiva del pozo en pozos de alto ángulo (“Los Tres Pilares”, siendo los otros dos la rotación de la tubería y la reología de baja gama del fluido de perforación

img

Figure 2

In general, it is recommended to achieve a minimum AV of 150 ft/min (46 m/min) in order to provide for effective cuttings transportation in high-angle holes. While hole cleaning efficiency will generally always increase with increasing AV, ECD will also increase and so 200 ft/min (61 m/min) is often considered as an optimal upper value. The relative importance of AV, along with the practicalities achieving the above range, is dependent on the specific hole-size / pipe-size combination. Therefore, Merlin's recommended flow ranges for each hole size (see Figure 3) don't always correspond with the above AV range. However, the AV value should still always be calculated as an indicator as to whether the flowrate could be a weak link in the overall hole cleaning system.

Figure 3

Please note that the above AV calculations and associated discussion is only valid where the hole retains the assumed gauge. Over-gauge hole (e.g. due to either washouts or borehole instability), can be one of the main enemies of good hole cleaning in high-angle wellbores, as the over-gauge sections can act as cuttings traps, presenting an increased pack-off risk during trips. Where the over-gauge section is due to wellbore instability, then there will likely be cavings to deal with as well, which present an even greater hole cleaning challenge (more material to remove and material that is harder to remove).

Lee más
img

Figure 1

La Calculadora

01

imgCaudal

02

imgTamaño del pozo

03

imgTamaño de la tubería de perforación

Results
Caudal
Tamaño del pozo
Tamaño de la tubería de perforación
Perfect
270 m/min
75 ft/min

Lorem ipsum dolor sit amet, consectetuer adipiscing wisi enim ad minim veniam, quis nostrud exerci tation ullam lorem ipsum dolor sit amet, consectetuer.

    Download your results now, with some helpful tips from Merlin ERD





    Enter your email to receive your results as PDF with additional hole cleaning tips

    Call Now Button